Buy Floor Adhesives & UZIN KE 49 HT High Temperature Adhesive 14kg Full Pallet (33 Tubs Tail Lift) Online

T: 01604 439300
E: [email protected]
Mon-Fri: 07:15 - 19.00
Sat: 08.00 - 12.00
Tools & Trim
  • Free UK delivery
    on most orders over £250 net*
  • Worldwide delivery
     
  • Finance Available
    on orders over £250
 

UZIN KE 49 HT High Temperature Adhesive 14kg Full Pallet (33 Tubs Tail Lift)

Full Pallet 33 x 14kg Tubs

Temperature Tolerance From –20°C Up To +60°C**

Very Long Working Time

High Initial And Final Tack

Good Resistance To Plasticisers

Solvent-Free

Coverage: Up to 70m²

Size: 14kg

£3,828.00 ex vat
£4,593.60 inc vat
in stock
Description
Specification
Attachments

Full Pallet 33 x 14kg Tubs

UZIN KE 49 HT is a strong adhesive, specially designed for luxury vinyl tiles and vinyl. The hybrid application enables it to be used either as a pressure-sensitive adhesive or as a high-temperature adhesive in areas where coverings are exposed to high temperatures. It also minimizes the shrinkage of the coverings. For interior use.

SUITABLE ON / FOR:
- For homogeneous and heterogeneous vinyl floor coverings in sheets and tiles.
- For LVT.
- On absorbent and levelled substrates with suitable cohesive strength.
- On dense substrates (e.g. coatings or UZIN KR 410) with the double drop method.
- On warm water underfloor heating system.
- For exposure to castor wheels in accordance with DIN EN 12 529 from 1 mm thickness of levelling compound.
- For heavy wear in residential, commercial and industrial locations.
- Suitable for wet shampooing and spray extraction cleaning according to RAL 991 A2.
- Can be used like a “contact adhesive”.
- For areas exposed to extreme temperatures (only when a wet/semi-dry method is used to install the floor covering).

Packaging: Plastic bucket.
Pack Size: 14 kg.
Shelf Life: 12 months.
Colour: Blue.
Consumption: 200 - 300 g/m².
Open Time: 10 - 60 minutes*.
Working Time: 15 - 120 minutes*.
Ready For Foot Traffic: After 24 - 48 Hours*.
Minimum Application Temperature: 15 °C at floor level.
Loadable: after 24 hours*.
Weld Seams: after 24 hours*.
Final Strength: after 3 days*.


Related Products